Trying to Increase Electric Rates but Your Board Says “No”? Here Are Options

You can’t always get buy-in from your Board of Directors to raise electric rates

Electric utilities of all types (electric cooperatives, investor-owned, and public power) have oversight boards or commissions at the state and local level responsible for approving electric rates. They base their decisions on rate studies prepared to estimate the amount of revenue provided from rates, comparing those revenues to expenses, debt service, capital improvements, and the expected return on ratebase.

There are times that these oversight bodies may not pass or may delay rate increases that are needed. Reasons vary, I.e., lack of convincing an increase is required, a compelling argument not presented by management, or politics and ratepayer pushback. A rate increase voted down opens the door for "Plan B", the fallback plan. But, what is the fallback plan? This article discusses some Plan B approaches.

 The utility cost structure isn’t so flexible

 The cost structure of a utility is a mixture of fixed and variable costs. The typical cost mix in a distribution utility's operating costs is shown in this chart:

electric-utility-cost-structure.png

As customer power usage increases or decreases, power expense (75% of total costs) moves in the same direction. So, the operating income of the utility remains relatively unchanged.

Labor expense (10% of total cost) is based on the utility's headcount. For construction crews, either fixed assets are being installed, or fixed asset maintenance is being performed, so the labor dollars remain the same unless the headcount is reduced.

Moving beyond the power cost and labor cost buckets leaves the final 15% cost bucket. What's in that bucket? Office costs, health costs, retirement costs, consulting, and maintenance inventory. Besides consulting fees, there isn't a lot of wiggle room for cost reductions, as many of these costs also operate as fixed in nature.

 


Utility Accounting and Rates Specialists provides on-line/on-demand courses on operations and construction project accounting, rates, and management for new and experienced co-op and utility professionals and Board Members. Click on the button to see courses that will enhance your career skills and provide value to your organization!


What to do to address the electric fixed cost structure?

 As shown in the previous section, it isn't easy to find cost areas for substantial reductions. Some best practices of cost control we have seen used include:

 1.   Reduction in headcount coupled with evaluating the cost-benefit of outsourcing some areas. Outsourcing areas could include:

-      Construction

-      Tree trimming

-      Customer service

-      Security

-      Meter operations

2.   Use of technology to make operations more efficient.

Field tools with real-time access to systems streamline data flows. Engineering design tools (Building Information Modeling or BIM) make project design and management more efficient. Customer website access and chatbot assistance facilitate customer service. Artificial intelligence is moving into many finance areas. All of these can allow future workforce reductions through attrition and the movement of personnel into other areas.

3.   Early retirement packages for employees to reduce headcount. The accounting for this approach allows deferral of buyout costs and recognizing these costs over an extended period.

Early retirement packages are used to urge employees in identified areas to take early retirement. That approach, along with normal attrition, can help for a speedier workforce reduction.

Early retirement packages do have a cost, but under the accounting rules, the buyout costs can be deferred and expensed over a more extended period. The longer expense period can help smooth the rate impacts and lead to longer team cash flow increases.

4.   Delay non-essential projects to reduce cash flow. Or issue debt to finance projects.

Project delay is the least popular but sometimes necessary option. Project managers will not be happy with these decisions, but delaying projects that do not impact system reliability can save short-term cash. Debt can be issued to finance projects to spread out payments over the useful life of the installed assets as an alternative to project delay.

5.   Implement electric rate surcharges.

Depending on your definition, adding a temporary rate surcharge may or may not be a rate "increase". We have seen utilities add surcharges (an example would be an additional $0.03 per kWh) for:

-        reduced hydro flow (which increases wholesale electric rates), future system capacity upgrades due to increased industrial loads, or building of cash reserves for future rate stabilization.

Your customers may think these are rate increases, so you will have to put a positive spin on the charges.

6.   Using regulatory accounting to defer and spread out expenses.

Our article library has several articles on regulatory accounting that dig down into the weeds and details on how it is used and can benefit your utility or cooperative (see electric utility regulatory accounting).  Suffice it to say that regulatory accounting can stretch out the recovery of large budget items or be used to build cash for items that may be several years in the future.

 Your customers may not like rate increases, but they want reliable service

 None of your customers look forward to rate increases, but meeting system reliability goals and utility growth drives customer rates. Your oversight board may get cold feet from time to time voting for increasing rates, so management should be prepared with good communication and messaging and also have a fallback plan if needed.

 

About Russ Hissom - Article Author

Russ Hissom, CPA is a principal of Utility Accounting & Rates Specialists a firm that provides power utilities rate, expert witness, and consulting services, and online/on-demand courses on accounting, rates, FERC/RUS construction accounting, financial analysis, and business process improvement services. Russ was a partner in a national accounting and consulting firm for 20 years. He works with electric investor-owned and public power utilities, electric cooperatives, broadband providers, and gas, water, and wastewater utilities. His goal is to share industry best practices to help your business perform effectively and efficiently and meet the challenges of the changing power and utilities industry.  

Find out more about Utility Accounting & Rates Specialists here, or you can reach Russ at russ.hissom@utilityeducation.com.

The material in this article is for informational purposes only and should not be taken as legal or accounting advice provided by Utility Accounting & Rates Specialists. You should seek formal advice on this topic from your accounting or legal advisor.


Previous
Previous

Electric Industry 101, Your 5-minute Guide to the Electric Business

Next
Next

Hurricane Ian and Sanibel Island Power Grid Rebuild - An insider’s view of electric co-op and utility mutual aid